This BlueOval City campus spans 3,600 acres and will be home to electric vehicles and battery manufacturing. This facility will reimagine how electric vehicles and batteries are designed and built. The project will create over 5,800 jobs and is on schedule to begin production by 2025.

Project Highlights

100,000

LF Silt Fence

200

AC Heavy Clearing

500,000

CY Stripping

11,000,000

CY Excavation

75,000

TN Lime Drying & Stabilization

340,000

SY Cement Stabilization

6,000

LF Temporary Storm Drainage

1,500,000

TN Crushed Stone Base

P&J is delivering site development packages for this two-phased manufacturing campus through multiple contracts. Scope of work includes erosion control and maintenance, clearing and grubbing, excavation and embankment, demucking, storm drainage systems, subgrade prep, cement stabilization, lime stabilization, building pad roadway and parking lot base construction, and temp grassing.